CURT 58445 Long-Lead Mini Fuse Bypass Switch for RV Dinghy Towing
This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.
- Long-Lead Mini Fuse Bypass Switch
Information:
Long-Lead Mini Fuse Bypass Switch
Application Summary:
| Year |
Make/Model |
| 2010-2011 |
Cadillac SRX |
| 2008 |
Chevrolet Equinox |
| 2014-2015 |
Chevrolet Malibu |
| 2003 |
Chevrolet Tracker |
| 2007-2020 |
Ford Edge |
| 2001-2020 |
Ford Escape |
| 2007-2011 |
Ford Explorer |
| 2009-2019 |
Ford Flex |
| 2006-2020 |
Ford Fusion |
| 2003 |
GMC Safari |
| 1997-2014 |
Honda CR-V |
| 2009-2014 |
Honda Fit |
| 2009-2012 |
Honda Pilot |
| 1998 |
Jeep Wrangler |
| 2009 |
Lexus RX350 |
| 2005 |
Pontiac G6 |
| 2007-2010 |
Pontiac G6 |
| 2007-2009 |
Saturn Aura |
| 2008-2010 |
Saturn Vue |
| 2008 |
Subaru Legacy |
| Attributes |
| California Proposition 65 |
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov |
| Class ID |
11, 11 |
| Container Volume Cubic Feet - XA |
0.00000 |
| Container Volume Cubic Meter - XA |
0.00000 |
| Country of Origin (Primary) |
TW |
| Finish |
BLACK RUBBER, BLACK RUBBER |
| Finish - XA |
BLACK RUBBER, BLACK RUBBER |
| Harmonized Tariff Code (Schedule B) |
8536509065 |
| Hazardous Material Code |
N |
| Item Class - XA |
CME, CME |
| Item Height - XA |
0.000, 0.000 |
| Item Length - XA |
0.000, 0.000 |
| Item Width - XA |
0.000, 0.000 |
| Life Cycle Status Code |
Available to Order |
| Master Case Height Inches - XA |
0.000, 0.000 |
| Master Case Length Inches - XA |
0.000, 0.000 |
| Master Case Volume Cubic Feet - XA |
0.00000, 0.00000 |
| Master Case Weight Lbs - XA |
0.000, 0.000 |
| Master Case Width Inches - XA |
0.000, 0.000 |
| Material - XA |
THERMOPLASTIC RUBBER, THERMOPLASTIC RUBBER |
| Mount Type Description - XA |
Not Applicable, Not Applicable |
| NAFTA Preference Criterion Code |
B |
| Pallet Qty - XA |
0.000, 0.000 |
| Pallet Total Height Inches - XA |
0.000, 0.000 |
| Pallet Total Weight Per - XA |
0.000, 0.000 |
| Parcel Allowed - XA |
Yes, Yes |
| Price Code - XA |
E15, E15 |
| Product Weight - XA |
0.000, 0.000 |
| Rate Class - XA |
65.0, 70.0 |
| Retail Height - XA |
2.000, 2.000 |
| Retail Length - XA |
9.000, 9.000 |
| Retail Width - XA |
4.000, 4.000 |
| Sales Family Code - XA |
ELECT, ELECT |
| Sales Family Description - XA |
ELECTRICAL COMPONENTS, ELECTRICAL COMPONENTS |
| Sales Group Description - XA |
RV HARNESS, RV HARNESS |
| SDR Required Flag |
N |
| Shipping Weight - XA |
0.170, 1.000 |
| Side Application Type Description - XA |
Not Applicable, Not Applicable |
| Tariff 301 - XA |
No, No |
| Truckload Volume Cubic Feet - XA |
0.00000, 0.00000 |
| Warranty |
One-Year Limited Warranty, One-Year Limited Warranty |
| GTIN |
00612314584451 |